Wind · Golden Plains WF2 Unit Trust · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
01 Sep 2026 00:00 → 20 Sep 2026 08:45 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.| Effective from | MLF |
|---|---|
| 2026-01-20 | 0.9837 |
| 2026-07-01 | 0.9823 |
| Capex total (greenfield) |
$4,219.41M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$7,574,289
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$32.32M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Reported project cost for the full Golden Plains Wind Farm appears to be about A$4 billion, with sources describing Golden Plains as a 1,333 MW project and Stage 2/West as part of the larger development. West stage construction commenced in mid-2024 and is described as ~574 MW / 577 MW in project materials; the owner/developer sources did not provide a separate West-only capital cost, so the full-project reported cost was allocated to this site as the best available plant-level proxy. O&M values were not plant-specific, so server defaults were used for wind onshore.