Golden Plains Wind Farm West (GPWFWST1)

Wind · Golden Plains WF2 Unit Trust · Wind Turbine - Onshore

Development AEMO: Committed VIC1 Wind - Wind NEM data · 24 hours
557 MW
Registered nameplate capacity
24 hours revenue
$66.9k
Capacity factor
15.9%
Revenue / MWh
$31.39
Est. SRMC
$0.53/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
557 MW

AEMO status Committed
Project status Development (AI)

Region VIC1
Coordinates

MLF 0.9823
DUID GPWFWST1
Owner Golden Plains WF2 Unit Trust
Commissioned Feb 2027
Expected closure 2057
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
19 Sep 2026 03:30 → 20 Sep 2026 03:30 AEST

Dispatch & revenue

19 Sep 2026 03:30 → 20 Sep 2026 03:30 AEST

Energy revenue (× MLF)
$66.9k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
2,130.0 MWh
Available
307.2 MWh
Curtailed
145.2 MWh
Curtailment
47.2%
of available
MLF used
0.9823
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of chargeINITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2026-01-20 0.9837
2026-07-01 0.9823

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
557 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
$4,219.41M

Shown in table
$4,219.41M (2026 real AUD)

Reported / source value
$4,000.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Confirms Stage 2 / West is part of the larger 1,333 MW mega-project, but does not give a West-only AUD cost.

Reference
Ingka Investments secures 15% of Stage 2 in southern hemisphere’s largest wind farm (medium confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$7,574,289

Shown in table
$7.57M (2026 real AUD)

Reported / source value
$7.18M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$32.32M

Shown in table
$32.32M (2026 real AUD)

Reported / source value
$30.69M (2024 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

How this was derived
Server-side fallback default used because no plant-specific onshore wind O&M cost was found.

Fixed OPEX / MW-yr
$58,017

Shown in table
$58.0k (2026 real AUD)

Reported / source value
$55.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback default used because no plant-specific onshore wind variable O&M cost was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Reported project cost for the full Golden Plains Wind Farm appears to be about A$4 billion, with sources describing Golden Plains as a 1,333 MW project and Stage 2/West as part of the larger development. West stage construction commenced in mid-2024 and is described as ~574 MW / 577 MW in project materials; the owner/developer sources did not provide a separate West-only capital cost, so the full-project reported cost was allocated to this site as the best available plant-level proxy. O&M values were not plant-specific, so server defaults were used for wind onshore.

Sources