Wind · Golden Plains WF1 Pty Ltd as trustee for the Golden Plains WF1 Unit Trust · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
14 May 2026 23:45 → 13 Jun 2026 23:45 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-08-06 | 0.9808 |
| 2025-07-01 | 0.9834 |
| Capex total (greenfield) |
$2,183.41M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$8,384,816
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$0.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Project-specific owner/developer announcement states Golden Plains Wind Farm East is the $2 billion, 756 MW first stage of the Golden Plains Wind Farm mega-project, with construction commencing in 2023. The unit’s registered capacity is 260.4 MW, so capex_per_mw_aud is allocated on a simple pro-rata basis from the stage-level project cost; this may not reflect unit-specific expenditure. Onshore wind operating costs were not found in a plant-specific source, so O&M fields are left null rather than substituting benchmarks.