Solar · Glenrowan Solar Farm Pty Ltd as trustee for Glenrowan Solar Farm Trust · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
15 May 2026 09:00 → 14 Jun 2026 09:00 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9626 |
| 2025-07-01 | 0.9490 |
| Capex total (greenfield) |
$172.78M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh default |
$0.25
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Plant-specific greenfield capex was not found in official owner/developer, government, or finance announcements from the search results. The project is documented as a 130 MWdc solar farm with single-axis tracking, and construction/financial close timing indicates commissioning in 2023-2024, but no total project investment figure was located. AEMO/CSIRO benchmark values were not applied because the requested capex priority requires a plant-specific figure first. Technology default operating assumptions were not substituted because no source-backed large-scale solar O&M benchmark was extracted in the retrieved excerpts. Asset life set to a typical utility-scale solar PV planning assumption only.