Glenellen Solar Farm (GESF1)

Solar · Glenellen Solar Farm Pty Ltd · Solar PV - Fixed

Construction AEMO: Publicly Announced NSW1 Solar - Solar NEM data · 24 hours
260 MW
Researched capacity
24 hours revenue
$26.2k
Capacity factor
6.4%
Revenue / MWh
$65.65
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity (AI)
260 MW

Global Power Generation project page (glenellensolarfarm.globalpower-generation.com.au, 2024) states 260 MWdc / 200 MWac.

AEMO status Publicly Announced
Project status Construction (AI)

Monford Group project page (2024) describes Glenellen Solar Farm as a project being delivered; Global Power Generation site describes it as a live project page with build details.

Region NSW1
Coordinates -35.90040, 146.93970 (AI)

Global Power Generation project page (2024) states the site is near Jindera/Albury in Greater Hume Shire; planning material for the project identifies the Glenellen/Jindera site area.

MLF 0.8977
DUID GESF1
Owner Glenellen Solar Farm Pty Ltd
Commissioned
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM Trina Solar
Module / inverter supplier PV modules
Inverter OEM
Inverter model
Equipment confidence medium
Stats window
21 Jul 2026 00:00 → 21 Jul 2026 23:59 AEST

Dispatch & revenue

21 Jul 2026 00:00 → 21 Jul 2026 23:59 AEST

Energy revenue (× MLF)
$26.2k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
398.5 MWh
Available
398.5 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.8977
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of chargeINITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2025-11-11 0.9255
2026-07-01 0.8977

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
260 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$272.93M

Shown in table
$272.93M (2026 real AUD)

Reported / source value
$250.00M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Plant-specific greenfield capital value reported in project amendment report.

Reference
Glenellen Solar Farm Amendment Report (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$1,049,714

Shown in table
$1.05M (2026 real AUD)

Reported / source value
$1.25M (2023 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

How this was derived
Calculated from reported project capital value and approved 200 MW capacity.

Reference
Glenellen Solar Farm (high confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
$2.62M

Shown in table
$2.62M (2026 real AUD)

Reported / source value
$2.40M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Annual fixed O&M estimated from benchmark and registered capacity.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report: Solar (medium confidence)
Source recorded 08 Jun 2026

Fixed OPEX / MW-yr
$13,100

Shown in table
$13.1k (2026 real AUD)

Reported / source value
$12.0k (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as solar fixed O&M benchmark for a utility-scale plant.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report: Solar (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Plant-specific capital value of c. A$250 million appears in the NSW planning amendment report for the 200 MW project. No separate refurbishment cost identified. Fixed O&M uses AEMO/Aurecon 2024 large-scale solar PV benchmark of A$12,000/MWp/year; for 200 MW this implies about A$2.4 million/year. The project is described by GPG as its biggest solar farm to date and began construction in September 2024.

Sources