Gladstone (GSTONE6)

Coal · Gladstone Power Station Participants · Turbine - Steam Sub Critical

Operational AEMO: In Service QLD1 Fossil - Black Coal NEM data · 30 days
280 MW
Registered nameplate capacity
30 days revenue
$6.15M
Capacity factor
34.0%
Revenue / MWh
$89.69
Est. SRMC
$54.96/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
280 MW

AEMO status In Service
Project status Operational (AI)

NRG Gladstone Power Station website (nrggos.com.au) describes Gladstone Power Station as an existing world-class facility in service.

Region QLD1
Coordinates -23.85070, 151.21930 (AI)

Grokipedia page for Gladstone Power Station gives site coordinates approximately 23.8507° S, 151.2193° E.

MLF 0.9461
DUID GSTONE6
Owner Gladstone Power Station Participants
Commissioned
Expected closure 2035
Closure date
Technology Turbine - Steam Sub Critical
Fuel Fossil - Black Coal
Steam turbine OEM Siemens Energy
Turbine / boiler supplier Steam turbines / boilers
Equipment confidence medium
Stats window
15 May 2026 03:10 → 14 Jun 2026 03:10 AEST

Dispatch & revenue

15 May 2026 03:10 → 14 Jun 2026 03:10 AEST

Energy revenue (× MLF)
$6.15M
FCAS revenue (× MLF)
$93
FCAS volume
77.9 MWh
Dispatched
68,612.0 MWh
Available
125,086.5 MWh
Curtailed
56,481.5 MWh
Curtailment
45.2%
of available
MLF used
0.9461
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9403
2025-07-01 0.9461

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Black coal
Capacity
280 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$54.96/MWh
Capex total (greenfield)
$1,033.76M

Shown in table
$1,033.76M (2026 real AUD)

Reported / source value
$980.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$3,691,983

Shown in table
$3.69M (2026 real AUD)

Reported / source value
$3.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$69.57M

Shown in table
$69.57M (2026 real AUD)

Reported / source value
$65.96M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$248,477

Shown in table
$248.5k (2026 real AUD)

Reported / source value
$235.6k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Generic sub-critical boiler fixed O&M proxy; not plant-specific.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 07 Jun 2026

Variable OPEX / MWh
$14.55

Shown in table
$14.55 (2026 real AUD)

Reported / source value
$13.79 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Generic sub-critical boiler variable O&M proxy; not plant-specific.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 07 Jun 2026

Fuel cost / GJ default
$4.50

Shown in table
$4.50 (2026 real AUD)

Heat rate GJ/MWh
8.98

Shown in table
$8.98 (2026 real AUD)

How this was derived
Used as fallback heat-rate assumption for black coal generation.

Reference
Heat rates – Encapsulates the efficiency of thermal generators (high confidence)
Source recorded 07 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
Gladstone Power Station was officially opened in September 1976; the plant’s unit sizes are 280 MW. AEMO/Aurecon 2024 review provides a generic black-coal new entrant heat rate of 8.98 GJ/MWh and availability assumptions for Australian black coal plants; the same review also contains a generic sub-critical boiler O&M example, which is used here only as a fallback proxy because plant-specific O&M was not located. Capex is left null because no plant-specific original construction cost source was found in the searched official and owner sources.