Gladstone (GSTONE4)

Coal · Gladstone Power Station Participants · Turbine - Steam Sub Critical

Operational AEMO: In Service QLD1 Fossil - Black Coal NEM data · 16h
280 MW
Registered nameplate capacity
16h revenue
$27.5k
Capacity factor
16.7%
Revenue / MWh
$36.69
Est. SRMC
$52.60/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
280 MW

AEMO status In Service
Project status Operational (AI)

NRG Gladstone Power Station website (nrgos.com.au) describes Gladstone as a world-class facility providing reliable electricity and details six 280 MW turbogenerators in service.

Region QLD1
Coordinates -23.85070, 151.21930 (AI)

Grokipedia snippet for Gladstone Power Station gives site coordinates approximately 23.8507° S, 151.2193° E.

MLF 0.9437
DUID GSTONE4
Owner Gladstone Power Station Participants
Commissioned
Expected closure 2035
Closure date
Technology Turbine - Steam Sub Critical
Fuel Fossil - Black Coal
Steam turbine OEM Siemens Energy
Turbine / boiler supplier steam turbines and boilers
Equipment confidence medium
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 16:15 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 16:15 AEST

Energy revenue (× MLF)
$27.5k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
748.5 MWh
Available
1,143.3 MWh
Curtailed
688.3 MWh
Curtailment
60.2%
of available
MLF used
0.9437
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9410
2025-07-01 0.9437

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Black coal
Capacity
280 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$52.60/MWh
Capex total (greenfield)
$1,033.76M

Shown in table
$1,033.76M (2026 real AUD)

Reported / source value
$980.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$3,691,983

Shown in table
$3.69M (2026 real AUD)

Reported / source value
$3.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$4.00

Shown in table
$4.00 (2026 real AUD)

Fuel cost / GJ default
$4.50

Shown in table
$4.50 (2026 real AUD)

Heat rate GJ/MWh default
10.80

Shown in table
$10.80 (2026 real AUD)

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
No plant-specific greenfield capex announcement for GSTONE4/Gladstone Power Station was found in the searched official and quasi-official sources. AEMO sources confirm the unit is part of the NEM generation information system, but the retrieved pages did not provide project cost, O&M, heat rate, fuel price, or emissions parameters for this specific unit. Because the user required source-backed research and the prompt forbids substituting benchmark capex when a plant-specific figure is not found, capex remains unset. AEMO 2024 technology-cost material was located for fallback benchmarking only, but not applied here because the instruction prioritises plant-specific reporting and the exact benchmark values for black coal subcritical were not extracted from the retrieved passages.

Sources