Coal · EDL CSM Qld Pty Ltd · Reciprocating Engine - Spark ignition
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9538 |
| 2025-07-01 | 0.9564 |
| Capex total (greenfield) |
$66.29M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,472,737
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.92M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$42,674
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$24.98
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$10.87
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
9.00
Shown in table How this was derived |
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Plant-specific greenfield capex was found in a contemporaneous report stating the project cost was estimated at A$35 million. The station was commissioned in 2006. For O&M and performance, no site-specific values were found, so AEMO 2024 waste-gas reciprocating-engine defaults were used. Note that the EDL project page currently describes 38.3 MW, while other EDL/source materials and the DUID capacity indicate a larger historical registered capacity; capex per MW is calculated using the provided 45.01 MW capacity.