Gannawarra Solar Farm (GANNSF1)

Solar · Gannawarra Solar Farm Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: In Service VIC1 Solar - Solar NEM data · 24 hours
55 MW
Registered nameplate capacity
24 hours revenue
$-622
Capacity factor
8.2%
Revenue / MWh
$-5.75
Est. SRMC
$0.34/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
55 MW

AEMO status In Service
Project status Operational (AI)

Edify Energy project page describes Gannawarra Solar Farm as a completed 60.0 MWp project; SMA success story states it supplied the inverters for the site (edifyenergy.com; sma-australia.com.au).

Region VIC1
Coordinates -35.67300, 143.96800 (AI)

Wikipedia and Edify Energy place the site 13 km west of Kerang / west of Kerang in northwest Victoria (wikipedia.org; edifyenergy.com).

MLF 0.9305
DUID GANNSF1
Owner Gannawarra Solar Farm Pty Ltd
Commissioned
Expected closure 2048
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM SMA
Module / inverter supplier Sunny Central 2500-EV / medium-voltage power station
Inverter OEM
Inverter model
Equipment confidence high
Stats window
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

Dispatch & revenue

12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

Energy revenue (× MLF)
$-622
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
108.1 MWh
Available
108.1 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9305
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8962
2025-07-01 0.9305

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
55 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.34/MWh
Capex total (greenfield)
$108.11M

Shown in table
$108.11M (2026 real AUD)

Reported / source value
$80.00M (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reported EPC contract value for stage one / first phase of Gannawarra Solar Farm; used as the best plant-specific construction cost found.

Reference
RCR AWARDED $80M CONTRACT FOR GANNAWARRA SOLAR FARM (high confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$1,965,602

Shown in table
$1.97M (2026 real AUD)

Reported / source value
$1.45M (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived capex per MW from the reported contract value and stated 60 MWp stage-one capacity.

Reference
RCR AWARDED $80M CONTRACT FOR GANNAWARRA SOLAR FARM (high confidence)
Source recorded 07 Jun 2026

Fixed OPEX (annual)
$1.49M

Shown in table
$1.49M (2026 real AUD)

Reported / source value
$1.10M (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$27,027

Shown in table
$27.0k (2026 real AUD)

Reported / source value
$20.0k (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific O&M source was located in the available search results; server-side default retained.

Variable OPEX / MWh
$0.34

Shown in table
$0.34 (2026 real AUD)

Reported / source value
$0.25 (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M source was located in the available search results; server-side default retained.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Greenfield capex uses the reported Stage 1 EPC contract value of over A$80 million for 60 MWp DC, which is the closest plant-specific construction cost located. This likely covers stage 1 rather than the entire 60 MW site, so treat as a proxy and verify if a total-project figure is required. Gannawarra Solar Farm is a 60 MWp DC single-axis tracking project operating since March 2018; commissioned by Q1 2018/Q1 2018 expectation in the EPC notice and operational since March 2018 on project pages.

Sources