Solar · Gannawarra Solar Farm Pty Ltd · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8962 |
| 2025-07-01 | 0.9305 |
| Capex total (greenfield) |
$108.11M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,965,602
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$1.49M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$27,027
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.34
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Greenfield capex uses the reported Stage 1 EPC contract value of over A$80 million for 60 MWp DC, which is the closest plant-specific construction cost located. This likely covers stage 1 rather than the entire 60 MW site, so treat as a proxy and verify if a total-project figure is required. Gannawarra Solar Farm is a 60 MWp DC single-axis tracking project operating since March 2018; commissioned by Q1 2018/Q1 2018 expectation in the EPC notice and operational since March 2018 on project pages.