Solar · Shell New Energies Australia Pty Ltd · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 16:15 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9788 |
| 2025-07-01 | 0.9977 |
| Capex total (greenfield) |
$222.15M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,371,308
Shown in table Reported / source value How this was derived |
| Fixed OPEX (annual) |
$3.42M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$21,097
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.26
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
How this was derived |
Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 07 Jun 2026
Notes
No reliable plant-specific greenfield capex announcement was found in the searched official sources. Shell confirms Gangarri is a 120 MW solar project in Woleebee, Queensland, built on Shell QGC land, and describes it as an investment, but no total project cost was disclosed in the accessible source. Capacity mismatch noted: the prompt lists 162 MW, while Shell sources describe 120 MW; capex could not be normalised to the DUID from a plant-specific cost figure. Default solar_tracking capex/O&M values were therefore used as fallback only for non-capex fields, and capex remains unverified.