Flyers Creek Wind Farm (FLYCRKWF)

Wind · Flyers Creek Wind Farm Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service NSW1 Wind - Wind NEM data · 24 hours
146 MW
Registered nameplate capacity
24 hours revenue
$12.3k
Capacity factor
6.3%
Revenue / MWh
$56.32
Est. SRMC
$0.58/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
146 MW

AEMO status In Service
Project status Operational (AI)

Iberdrola Australia asset page (operating renewable energy assets) and commissioned date 2024-10-01 indicate full commercial service.

Region NSW1
Coordinates -33.58000, 149.10000 (AI)

NSW planning documents and project pages place Flyers Creek Wind Farm near Orange / about 20 km south west of Orange, NSW.

MLF 1.0278
DUID FLYCRKWF
Owner Flyers Creek Wind Farm Pty Ltd
Commissioned Oct 2024
Expected closure 2063
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM GE
Turbine model 3.8-137
Equipment confidence high
Stats window
12 Jun 2026 22:55 → 13 Jun 2026 22:55 AEST

Dispatch & revenue

12 Jun 2026 22:55 → 13 Jun 2026 22:55 AEST

Energy revenue (× MLF)
$12.3k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
218.9 MWh
Available
122.5 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
1.0278
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 1.0205
2025-07-01 1.0278

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
146 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.58/MWh
Capex total (greenfield)
$382.10M

Shown in table
$382.10M (2026 real AUD)

Reported / source value
$350.00M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Portfolio-level investment statement; not used as site-specific capex, but supports context.

Reference
Iberdrola Australia commits to construction of 145MW Flyers Creek Wind Farm in NSW (medium confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$2,625,368

Shown in table
$2.63M (2026 real AUD)

Reported / source value
$2.40M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Capex per MW derived from the reported nominal project cost and capacity.

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh
$0.58

Shown in table
$0.58 (2026 real AUD)

Reported / source value
$0.50 (2022 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback retained because no project-specific variable O&M was located.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026

Notes
Project-specific total cost of roughly A$350 million was stated in Flyers Creek Wind Farm CCC minutes in April 2023; this was used in preference to AEMO benchmarks for greenfield capex. The asset was committed to construction in February 2022 and was operational by 2024. No reliable plant-specific fixed O&M, heat rate, or fuel cost applies to wind; variable O&M default retained from server-side fallback only. AEMO/CSIRO onshore wind technical life guidance indicates 25-year design life, with some investors assuming 30-35 years; 25 years used here as the conservative default.