Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 14:05 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8651 |
| 2025-07-01 | 0.8898 |
| Capex total (greenfield) |
$229.73M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,414,940
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table How this was derived |
| Variable OPEX / MWh default |
$0.25
Shown in table How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Plant-specific greenfield capex found in NSW planning documents: estimated capital cost up to A$170 million for the Finley Solar Farm. This figure appears to be the project CIV/feasibility estimate rather than a later owner financial-close disclosure, but it is the best project-specific greenfield capex located. Operational since 2019. No reliable plant-specific O&M or refurbishment cost found in the searched sources, so those fields are left null; do not substitute benchmark O&M without a specific project source.