Eraring GT (ERGT01)

Other Generators · Origin Energy Eraring Pty Ltd · Turbine - OCGT

Operational AEMO: In Service NSW1 Fossil - Diesel NEM data · 16h
42 MW
Registered nameplate capacity
16h revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$96.96/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
42 MW

AEMO status In Service
Project status Operational (AI)

Origin Energy Eraring Power Station page (originenergy.com.au) describes the station as comprising four 720 MW coal-fired generator units and one 42 MW diesel generator, indicating full commercial service.

Region NSW1
Coordinates -33.06220, 151.52090 (AI)

GEO / Global Energy Observatory entry for Eraring Coal Power Plant lists coordinates -33.0622, 151.5209.

MLF 0.9846
DUID ERGT01
Owner Origin Energy Eraring Pty Ltd
Commissioned
Expected closure 2032
Closure date
Technology Turbine - OCGT
Fuel Fossil - Diesel
Equipment OEM Toshiba
Equipment type / model steam-driven turbo-alternator (720 MW unit)
Secondary OEM Unknown
Secondary equipment 42 MW diesel generator
Equipment confidence high
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 16:15 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 16:15 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9846
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9855
2025-07-01 0.9846

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
42 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$96.96/MWh
Capex total (greenfield)
$63.85M

Shown in table
$63.85M (2026 real AUD)

Reported / source value
$49.80M (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,538,462

Shown in table
$1.54M (2026 real AUD)

Reported / source value
$1.20M (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$5.47M

Shown in table
$5.47M (2026 real AUD)

Reported / source value
$4.26M (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$131,756

Shown in table
$131.8k (2026 real AUD)

Reported / source value
$102.8k (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO technical-cost source provides a comparable OCGT-style fixed operating cost and heat rate parameters.

Reference
Generator Technical (medium confidence)
Source recorded 07 Jun 2026

Variable OPEX / MWh
$6.00

Shown in table
$6.00 (2026 real AUD)

Reported / source value
$4.68 (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as the latest benchmark variable O&M for OCGT-type plant.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 07 Jun 2026

Fuel cost / GJ default
$12.00

Shown in table
$12.00 (2026 real AUD)

Heat rate GJ/MWh
7.58

Shown in table
$7.58 (2026 real AUD)

How this was derived
Used as a proxy heat rate for this diesel-fired OCGT where plant-specific heat rate was not found.

Reference
Generator Technical (medium confidence)
Source recorded 07 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
No reliable plant-specific greenfield capex announcement was found for Eraring GT (ERGT01) after searching owner, project, and government sources. AEMO benchmark values were used only for operating assumptions. Eraring GT is listed as a 41.5 MW OCGT diesel unit at Eraring; the exact commission date was not located in the search results.

Sources