Eraring (ER03)

Coal · Origin Energy Eraring Pty Ltd · Turbine - Steam Sub Critical

Closed AEMO: In Service - Announced Withdrawal (Permanent) NSW1 Fossil - Black Coal NEM data · 2h
720 MW
Registered nameplate capacity
2h revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$49.77/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
720 MW

AEMO status In Service - Announced Withdrawal (Permanent)
Project status Closed (AI)

Power Technology profile updated 2024: Eraring Power Station is currently active and was commissioned in 1982.

Region NSW1
Coordinates -33.06193, 151.51975 (AI)

FindLatitudeAndLongitude.com listing for Eraring Power Station, 5 Foreshore Street, Eraring NSW 2264, Australia.

MLF 0.9854
DUID ER03
Owner Origin Energy Eraring Pty Ltd
Commissioned
Expected closure 2027
Closure date 19 Aug 2027
Technology Turbine - Steam Sub Critical
Fuel Fossil - Black Coal
Steam turbine OEM Doosan Enerbility
Turbine / boiler supplier Steam turbine / boiler supplier
Equipment confidence high
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 02:20 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 02:20 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9854
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9855
2025-07-01 0.9854

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Black coal
Capacity
720 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$49.77/MWh
Capex total (greenfield)
$2,658.23M

Shown in table
$2,658.23M (2026 real AUD)

Reported / source value
$2,520.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Supports that Eraring is an existing operating coal station rather than a clearly documented greenfield project in the searched sources.

Reference
Origin Energy Eraring Power Station Statement of Environmental Commitment (medium confidence)
Source recorded 07 Jun 2026

Capex refurbishment
Capex / MW derived
$3,691,983

Shown in table
$3.69M (2026 real AUD)

Reported / source value
$3.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$4.00

Shown in table
$4.00 (2026 real AUD)

Fuel cost / GJ default
$4.50

Shown in table
$4.50 (2026 real AUD)

Heat rate GJ/MWh
10.17

Shown in table
$10.17 (2026 real AUD)

How this was derived
Primary benchmark used as the fallback heat-rate assumption.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 07 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
No reliable plant-specific greenfield construction/investment cost for Eraring/ER03 was found in the searched official and primary sources. Eraring is an existing 2,880 MW coal-fired station; the user-supplied DUID unit ER03 is part of that station, so greenfield capex is not directly inferable from available sources. Used AEMO/Aurecon 2024 technical parameter review only for the fallback heat-rate benchmark for Australian black-coal subcritical/supercritical plants, and used the user-provided emissions intensity default as an operating assumption.

Sources