Coal · Origin Energy Eraring Pty Ltd · Turbine - Steam Sub Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
14 May 2026 22:00 → 13 Jun 2026 22:00 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9855 |
| 2025-07-01 | 0.9854 |
| Capex total (greenfield) |
$2,658.23M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,691,983
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$4.00
Shown in table |
| Fuel cost / GJ default |
$4.50
Shown in table |
| Heat rate GJ/MWh |
10.17
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No reliable plant-specific greenfield construction/investment cost for Eraring/ER03 was found in the searched official and primary sources. Eraring is an existing 2,880 MW coal-fired station; the user-supplied DUID unit ER03 is part of that station, so greenfield capex is not directly inferable from available sources. Used AEMO/Aurecon 2024 technical parameter review only for the fallback heat-rate benchmark for Australian black-coal subcritical/supercritical plants, and used the user-provided emissions intensity default as an operating assumption.