Coal · Origin Energy Eraring Pty Ltd · Turbine - Steam Sub Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 17:20 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9855 |
| 2025-07-01 | 0.9846 |
| Capex total (greenfield) |
$2,581.97M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,586,066
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$46.62M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$64,754
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$8.20
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ default |
$4.50
Shown in table |
| Heat rate GJ/MWh |
8.91
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
Eraring is a 2,880 MW coal-fired power station; no plant-specific greenfield construction cost was found in the searched official sources, so no capex figure is reported. Used AEMO/GHD black coal super-critical O&M estimates as the closest published benchmark for an operating coal unit, and AEMO heat-rate data listing Eraring at 8.91 GJ/MWh incremental heat rate. Eraring construction began in 1976 and the first unit was commissioned in March 1982; however, no original build cost was identified in the sources searched. The NSW Government agreement indicates Eraring is expected to cease operation by no later than 30 April 2029, but that is an operating/closure note, not capex.