Wind · Tilt Renewables · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
12 Jun 2026 15:25 → 13 Jun 2026 15:25 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9810 |
| 2025-07-01 | 0.9845 |
| Capex total (greenfield) |
$740.74M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,409,171
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$12.22M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$72,751
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.66
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Greenfield capex is based on Tilt Renewables' reported expected total construction cost of approximately A$560 million at financial close in 2018 for the 336 MW Dundonnell Wind Farm. Site-specific operating cost disclosure was not located; fixed and variable O&M use the provided fallback defaults. The asset was expected to complete in late 2020 and is operational, but the schema records the original construction cost only.