Diapur Wind Farm (DIAPURWF1)

Wind · Diapur Wind Farm Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service VIC1 Wind - Wind NEM data · 3h
8 MW
Registered nameplate capacity
3h revenue
$361
Capacity factor
26.0%
Revenue / MWh
$57.92
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
8 MW

AEMO status In Service
Project status Operational (AI)

RenewEconomy, 2021: Diapur wind farm had started to power up and full operation commenced late 2021.

Region VIC1
Coordinates -36.36400, 141.52600 (AI)

BayWa r.e. Australia project page: site located approximately 19 km west of Nhill, Victoria, on Diapur-Lawloit Road.

MLF 0.8959
DUID DIAPURWF1
Owner Diapur Wind Farm Pty Ltd
Commissioned Oct 2021
Expected closure 2046
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Vestas
Turbine model V150-4.0
Equipment confidence high
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 02:50 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 02:50 AEST

Energy revenue (× MLF)
$361
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
6.2 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.8959
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8733
2025-07-01 0.8959

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
8 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$18.57M

Shown in table
$18.57M (2026 real AUD)

Reported / source value
$17.60M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026

Notes
Plant-specific greenfield capex was not found in official owner, government, or project finance sources during search. The available official and developer sources confirm the asset name, owner, location, commissioning in 2021, and 7.4 MW operating capacity, but do not disclose total construction cost. An 8 MW registered capacity was provided by the user; no plant-specific capex could be verified for that capacity. O&M defaults and asset life were not sourced and are left null for review.

Sources