Solar · Darling Downs Solar Farm Pty Ltd · Solar PV - Fixed
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
07 Jun 2026 00:50 → 14 Jun 2026 00:50 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9755 |
| 2025-07-01 | 0.9849 |
| Capex total (greenfield) |
$299.31M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,473,631
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$3.01M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$24,862
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.28
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
APA/ARENA sources identify the Darling Downs Solar Project as a 110 MW fixed-tilt PV farm with total project cost of $216.7 million (2016 nominal) and completion in 2022 / commissioning in 2019 per APA site. The user-provided capacity is 121 MW; capex_per_mw_aud is calculated using 110 MW from the project source to avoid overstating cost intensity. No separate refurbishment cost found.