Wind · Cullerin Range Wind Farm Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
15 May 2026 02:50 → 14 Jun 2026 02:50 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9317 |
| 2025-07-01 | 0.9521 |
| Capex total (greenfield) |
$95.30M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,176,796
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh |
$0.68
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Plant-specific construction cost was found in DUET/EDL materials describing estimated total construction costs of $69 million for the 30 MW Cullerin acquisition/project, operational by June 2017. This is used as the reported greenfield capex proxy for the site; no separate refurbishment cost was found. O&M and technical defaults for wind were not directly sourced in the available results, so only the internal variable O&M fallback is retained.