Culcairn Solar Farm (CUSF1)

Solar · Culcairn Solar Farm Pty Ltd as trustee for Culcairn Solar Farm Trust · Solar PV - Single axis tracking

Operational AEMO: Committed NSW1 Solar - Solar NEM data · 24 hours
350 MW
Registered nameplate capacity
24 hours revenue
$1.9k
Capacity factor
0.7%
Revenue / MWh
$31.64
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
350 MW

AEMO status Committed
Project status Operational (AI)

LinkedIn post by SMA Australia (2024/2025) states Culcairn Solar Farm is now in operation; project site also says commissioned 2025-08-01.

Region NSW1
Coordinates

MLF 0.9278
DUID CUSF1
Owner Culcairn Solar Farm Pty Ltd as trustee for Culcairn Solar Farm Trust
Commissioned Aug 2025
Expected closure 2060
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Equipment confidence low
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

Energy revenue (× MLF)
$1.9k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
59.8 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9278
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2025-06-10 0.9167
2025-07-01 0.9278

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
350 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$454.97M

Shown in table
$454.97M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown