Wind · CRWF Nominees Pty Ltd as trustee of the CRWF Trust · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9280 |
| 2025-07-01 | 0.9409 |
| Capex total (greenfield) |
$330.69M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,333,553
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$8.22M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Plant-specific greenfield capex was found from CEFC: $250 million for Crudine Ridge Wind Farm in 2018. Capacity used for capex normalization is 141.71 MW per user input, yielding about $1.76m/MW. Fixed O&M used server-side fallback because no plant-specific O&M figure was found in the searched sources. Onshore wind design life is typically around 30 years in AEMO/Aurecon technical review.