Wind · Crookwell Development Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
14 Jun 2026 00:00 → 14 Jun 2026 02:50 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9512 |
| 2025-07-01 | 0.9644 |
| Capex total (greenfield) |
$244.48M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,545,555
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$7.42M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$77,210
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.69
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Project-specific reported construction investment was found for Crookwell II: GPG said it would invest over A$177 million in construction and associated investments. A separate project announcement described the development as a $200 million Crookwell 2 Wind Farm. I used the more direct owner/developer reported figure of A$177 million as the primary capex. Fixed O&M was not found for this site, so an onshore-wind benchmark was used as fallback; variable O&M set from internal default. Capex year reflects the 2016 award/announcement timing rather than the 2018 commissioning date.