Wind · PARF Company 6 Pty Limited · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
12 Jun 2026 17:30 → 13 Jun 2026 17:30 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9672 |
| 2025-07-01 | 0.9691 |
| Capex total (greenfield) |
$1,148.65M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,536,264
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh |
$0.68
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Greenfield construction cost reported by Queensland Government and AGL as approximately A$850 million for the 453 MW project. Owner/operator is PARF-related; AGL originally developed and sold the project to PARF, with AGL continuing to operate under PPA arrangements until handover in 2024. Capacity used for capex/MW is 452.89 MW as provided. Fixed O&M not sourced specifically for this plant; server-side fallback not used in output because no plant-specific search result was retrieved.