Solar · ACEN RENEWABLES · Solar PV - Fixed
01 Jun 2026 00:00 → 14 Jun 2026 02:20 AEST
| Capex total (greenfield) |
$116.03M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.90M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$18,987
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.21
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
ACEN’s public project pages confirm a proposed 100 MW solar farm with a 180 MW / 2-hour BESS at Cooma (Bunyan), scheduled for construction in 2027, but I could not find a plant-specific greenfield total project cost from ACEN, government, or finance announcements. Therefore capex remains unfilled rather than using a benchmark. Operating cost and emissions fields use the provided fallback defaults for solar PV. The project page describes the site as hybrid; however the requested normalised type is solar_fixed, so the profile is normalised to solar_fixed only for the solar generation asset.