Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
15 May 2026 02:50 → 14 Jun 2026 02:50 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9729 |
| 2025-07-01 | 0.9724 |
| Capex total (greenfield) |
$270.70M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,097,261
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.96M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$22,398
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$12.90
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ default |
$11.00
Shown in table |
| Heat rate GJ/MWh default |
7.50
Shown in table |
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 07 Jun 2026
Notes
Plant-specific capital cost was found in a QGC/AGL announcement: exercise price for Condamine Power Station to be the higher of costs paid up to completion, currently estimated at A$170 million. The source refers to the 140 MW project under construction in 2008, while the registered unit capacity is 87.4 MW, so capex per MW is based on the provided DUID capacity. AEMO 2024 CCGT benchmark O&M values were used as fallback for operating cost assumptions.