Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
06 Jun 2026 19:55 → 13 Jun 2026 19:55 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9828 |
| 2025-07-01 | 0.9849 |
| Capex total (greenfield) |
$786.16M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,343,445
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$8.59M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$47,468
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$2.64
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
$12.66
Shown in table Reported / source value |
| Heat rate GJ/MWh |
10.50
Shown in table How this was derived |
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Plant was completed and commissioned in 2009 and acquired by Snowy Hydro on 30 January 2015. No owner-reported plant-specific capex figure was found in current official sources; the $500 million construction cost is attributed in secondary reporting and should be treated as reported-but-not-owner-verified. O&M and performance defaults were used from the 2024 AEMO/Aurecon cost review and server-side fallback where not directly specified.