Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
04 Jul 2026 03:40 → 03 Aug 2026 03:40 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9495 |
| 2025-07-01 | 0.9628 |
| 2026-07-01 | 0.9643 |
| Capex total (greenfield) |
$468.75M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,066,799
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table How this was derived Reference |
| Variable OPEX / MWh |
$0.65
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Plant-specific reported project cost found in secondary coverage citing Collector Wind Farm built at a cost of $360 million. This aligns with an AUD 179 million CEFC loan supporting the project and the 226.8 MW installed capacity. No verified plant-specific fixed O&M source was found, so O&M fields remain unset rather than inferred from benchmarks. The project reached full generation in 2021.