14 Jun 2026 00:00 → 14 Jun 2026 01:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9486 |
| 2025-07-01 | 0.9604 |
| Capex total (greenfield) |
$214.97M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,791,325
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table How this was derived |
| Variable OPEX / MWh |
$0.80
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Plant opened in February 2010, but the only plant-specific greenfield cost found was an ABC report from March 2008 stating construction had begun on a $135 million wind farm at Clements Gap. No reliable site-specific fixed O&M figure was found in the searched sources, so fixed O&M is left null rather than using the server-side fallback. A later Pacific Blue page confirms the site’s 56.7 MW capacity and 2010 commissioning.