Clements Gap Wind Farm (CLEMGPWF)

Wind · Pacific Hydro Clements Gap Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service SA1 Wind - Wind NEM data · 24 hours
57 MW
Registered nameplate capacity
24 hours revenue
$-1.9k
Capacity factor
33.1%
Revenue / MWh
$-4.22
Est. SRMC
$0.80/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
57 MW

AEMO status In Service
Project status Operational (AI)

Pacific Blue operating site page says the wind farm has been in service since commissioning in 2010; Wikipedia also lists it as Operational.

Region SA1
Coordinates -33.48090, 138.09870 (AI)

Wikipedia coordinates for Clements Gap Wind Farm: 33°28′51″S 138°05′55″E (-33.4809, 138.0987).

MLF 0.9604
DUID CLEMGPWF
Owner Pacific Hydro Clements Gap Pty Ltd
Commissioned
Expected closure 2039
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Suzlon
Turbine model S88/2100
Equipment confidence high
Stats window
12 Jun 2026 18:30 → 13 Jun 2026 18:30 AEST

Dispatch & revenue

12 Jun 2026 18:30 → 13 Jun 2026 18:30 AEST

Energy revenue (× MLF)
$-1.9k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
450.7 MWh
Available
386.2 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9604
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9486
2025-07-01 0.9604

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
57 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.80/MWh
Capex total (greenfield)
$214.97M

Shown in table
$214.97M (2026 real AUD)

Reported / source value
$135.00M (2008 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Plant-specific greenfield construction cost reported by ABC at the start of construction.

Reference
Work starts on $135m wind farm - ABC News (high confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MW derived
$3,791,325

Shown in table
$3.79M (2026 real AUD)

Reported / source value
$2.38M (2008 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Site capacity used to derive capex per MW.

Reference
Clements Gap wind farm | Pacific Blue (high confidence)
Source recorded 06 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

How this was derived
No reliable plant-specific fixed O&M figure was found in the searched sources.

Variable OPEX / MWh
$0.80

Shown in table
$0.80 (2026 real AUD)

Reported / source value
$0.50 (2008 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback default retained for variable O&M because no plant-specific source was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026

Notes
Plant opened in February 2010, but the only plant-specific greenfield cost found was an ABC report from March 2008 stating construction had begun on a $135 million wind farm at Clements Gap. No reliable site-specific fixed O&M figure was found in the searched sources, so fixed O&M is left null rather than using the server-side fallback. A later Pacific Blue page confirms the site’s 56.7 MW capacity and 2010 commissioning.