Wind · Squadron Energy Services Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
12 Jun 2026 14:05 → 13 Jun 2026 14:05 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2025-04-23 | 0.9497 |
| 2025-07-01 | 0.9430 |
| Capex total (greenfield) |
$1,318.41M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$12,738,241
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$6.65M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$64,252
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Plant-specific greenfield capex was found in an official Australian Industry Participation summary for Clarke Creek Wind Farm Stage 1. The project later secured $1 billion financing and stage one is a 450 MW project, but the reported capital expenditure used here is the official project capex figure from the 2021 AIP summary. Because the public source is for Stage 1, capex per MW is calculated using the registered DUID capacity of 103.5 MW as requested, which likely overstates unit cost if the $1.06 billion figure is for the broader stage-one project rather than this DUID alone.