Wind · Squadron Energy Services Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
03 Jun 2026 20:55 → 04 Jun 2026 20:55 AEST
Estimated $ per interval using regional RRP and MLF effective on each day.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).| Effective from | MLF |
|---|---|
| 2024-10-01 | 0.9497 |
| 2025-07-01 | 0.9430 |
| Capex total (greenfield) |
$1,292.29M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,729,550
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$12.50M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$36,070
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Project-specific greenfield capital expenditure was found in an official Australian Industry Participation summary for Clarke Creek Wind Farm (Stage 1): $1.04 billion, with construction starting in 2021. Squadron Energy and Tattarang also describe Clarke Creek as a $3 billion renewable energy precinct/hub covering stages 1 and 2; that figure appears to be for the broader precinct, not this DUID's stage-1 share, so the reported stage-1 project cost was used for capex_total_aud. Fixed O&M uses the 2025 AEMO/GHD onshore wind benchmark of $29,000/MW/year and variable O&M is included in the fixed component. Onshore wind has no fuel cost or heat rate and zero direct emissions.