Solar · Childers Solar Pty Ltd as trustee for the Childers Solar Trust · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
14 May 2026 22:30 → 13 Jun 2026 22:30 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9828 |
| 2025-07-01 | 0.9772 |
| Capex total (greenfield) |
$283.78M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,407,949
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.74M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$27,027
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.34
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Plant-specific greenfield capex was found in media coverage of the project as a $210 million approval/ project figure for Childers Solar Farm. A separate source also refers to it as a $175 million Childers Solar Farm, creating uncertainty about whether those figures reflect different scope/capacity states or reporting errors. Capacity used for per-MW calculation is the registered DUID capacity of 64.38 MW. No plant-specific O&M, fuel, heat-rate, or emissions data beyond zero direct emissions for solar PV was found, so O&M uses the provided fallback default.