Wind · Cherry Tree Wind Farm Pty Limited A.T.F. Cherry Tree Project Trust · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
12 Jun 2026 18:15 → 13 Jun 2026 18:15 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9976 |
| 2025-07-01 | 0.9980 |
| Capex total (greenfield) |
$133.67M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$3.34M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No reliable plant-specific greenfield capex figure was found in the searched owner/developer/government sources. AEMO/CSIRO benchmark inputs were therefore not used for capex because the user requested plant-specific investment figures first and none were located. Fixed O&M was applied from the server-side default as a fallback; wind variable O&M and emissions are effectively nil, with a small variable O&M default retained per instructions.