14 Jun 2026 06:50 → 15 Jun 2026 06:50 AEST
| Capex total (greenfield) |
$73.84M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
I could verify the site identity, owner, technology, and capacity from NEMStats and AEMO, but I could not find a plant-specific greenfield investment/capex announcement or official operating-cost assumptions for Ceduna BESS. No refurbishment information found. Capacity is 25 MW / 200 MWh.