Cattle Hill Wind Farm (CTHLWF1)

Wind · Wild Cattle Hill Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service TAS1 Wind - Wind NEM data · 24 hours
144 MW
Registered nameplate capacity
24 hours revenue
$77.9k
Capacity factor
45.3%
Revenue / MWh
$49.79
Est. SRMC
$0.66/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. TAS1 regional price (RRP) on right axis.

Key information
Capacity
144 MW

AEMO status In Service
Project status Operational (AI)

Cattle Hill Wind Farm site states the project is "fully operating"; site page, 2025.

Region TAS1
Coordinates -42.15100, 146.68800 (AI)

Wikipedia lists coordinates 42°09′04″S 146°41′17″E for Cattle Hill Wind Farm.

MLF 0.9924
DUID CTHLWF1
Owner Wild Cattle Hill Pty Ltd
Commissioned Feb 2021
Expected closure 2044
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Goldwind
Turbine model GW140 3S
Equipment confidence high
Stats window
12 Jun 2026 16:45 → 13 Jun 2026 16:45 AEST

Dispatch & revenue

12 Jun 2026 16:45 → 13 Jun 2026 16:45 AEST

Energy revenue (× MLF)
$77.9k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
1,564.3 MWh
Available
1,362.9 MWh
Curtailed
75.9 MWh
Curtailment
5.6%
of available
MLF used
0.9924
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9908
2025-07-01 0.9924

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
144 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.66/MWh
Capex total (greenfield)
$396.83M

Shown in table
$396.83M (2026 real AUD)

Reported / source value
$300.00M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Secondary project profile states the wind farm was being developed with A$300m investment.

Reference
Cattle Hill Wind Farm, Tasmania Region of Australia (medium confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MW derived
$2,755,732

Shown in table
$2.76M (2026 real AUD)

Reported / source value
$2.08M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh
$0.66

Shown in table
$0.66 (2026 real AUD)

Reported / source value
$0.50 (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No reliable plant-specific variable O&M figure was found; used the provided fallback default.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026

Notes
Project-specific greenfield capex found in a secondary project profile citing A$300m investment for the 148MW Cattle Hill wind farm. This is close to the registered 144MW DUID capacity, so used as the best available reported construction cost. No reliable plant-specific fixed O&M figure found; variable O&M fell back to the provided default. Wind projects typically have no fuel cost and zero direct emissions intensity.

Sources