Wind · Canunda Power Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
12 Jun 2026 20:15 → 13 Jun 2026 20:15 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9755 |
| 2025-07-01 | 0.9333 |
| Capex total (greenfield) |
$167.57M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,642,880
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$0.50
Shown in table |
| Fuel cost / GJ |
$0.00
Shown in table Reported / source value |
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Canunda Wind Farm was reported as a $92.5 million project commencing construction in April 2004 and launching in March 2005. The site has 46 MW installed capacity. No separate plant-specific refurbishment capex or O&M figures were found in the searched sources.