Coal · Joint Venture; Callide Energy Pty Ltd and IG Power (Callide) Ltd. · Turbine - Steam Super Critical
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
14 Jun 2026 00:00 → 14 Jun 2026 08:15 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9160 |
| 2025-07-01 | 0.9222 |
| Capex total (greenfield) |
$1,550.39M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
How this was derived Reference |
| Capex / MW derived |
$3,656,575
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$13.14M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$30,995
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh default |
$4.00
Shown in table |
| Fuel cost / GJ default |
$4.50
Shown in table |
| Heat rate GJ/MWh |
8.98
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Callide C is a 50/50 JV between CS Energy (through Callide Energy Pty Ltd) and IG Power (Callide) Ltd. The plant was commissioned in 2001 at a reported cost of A$800 million. CS Energy also states a major cooling-tower rebuild project was completed in 2024, but that is a refurbishment/brownfield cost and no total project cost was located in the searched official sources, so it is not included in capex_total_aud. Fixed O&M uses the 2024 Aurecon/AEMO review value for black-coal thermal plant; variable O&M and fuel cost were not reliably sourced in the retrieved documents.