Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
12 Jun 2026 17:15 → 13 Jun 2026 17:15 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9188 |
| 2025-07-01 | 0.9252 |
| Capex total (greenfield) |
$1,255.12M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,586,066
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$18.65M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$53,279
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$8.20
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$2.77
Shown in table Reported / source value How this was derived Reference |
| Heat rate GJ/MWh |
8.82
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
Callide B was commissioned in 1988 and is 100% owned by CS Energy. No plant-specific greenfield capex figure was found in official owner/government sources in the searched results, so capex remains unset rather than inferred from technology benchmarks. AEMO benchmark O&M for black coal super-critical large plant was used as the closest available official proxy for operating costs; however Callide B is sub-critical, so these O&M assumptions are approximate. System/market conditions and any post-commissioning refurbishments are not reflected in capex_total_aud.