Callide B (CALL_B_1)

Coal · CS Energy · Turbine - Steam Sub Critical

Operational AEMO: In Service QLD1 Fossil - Black Coal NEM data · 24 hours
350 MW
Registered nameplate capacity
24 hours revenue
$180.2k
Capacity factor
41.5%
Revenue / MWh
$51.76
Est. SRMC
$32.60/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
350 MW

AEMO status In Service
Project status Operational (AI)

Power Technology project profile and CS Energy site describe Callide B as in service/operating, with original operation from 1988.

Region QLD1
Coordinates -24.34495, 150.61975 (AI)

Global Energy Observatory lists Callide B coordinates as Latitude -24.34495, Longitude 150.61975.

MLF 0.9252
DUID CALL_B_1
Owner CS Energy
Commissioned
Expected closure 2031
Closure date
Technology Turbine - Steam Sub Critical
Fuel Fossil - Black Coal
Steam turbine OEM Hitachi
Turbine / boiler supplier Babcock Hitachi
Equipment confidence high
Stats window
12 Jun 2026 17:15 → 13 Jun 2026 17:15 AEST

Dispatch & revenue

12 Jun 2026 17:15 → 13 Jun 2026 17:15 AEST

Energy revenue (× MLF)
$180.2k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
3,482.3 MWh
Available
3,820.8 MWh
Curtailed
949.0 MWh
Curtailment
24.8%
of available
MLF used
0.9252
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9188
2025-07-01 0.9252

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Black coal
Capacity
350 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$32.60/MWh
Capex total (greenfield)
$1,255.12M

Shown in table
$1,255.12M (2026 real AUD)

Reported / source value
$1,225.00M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$3,586,066

Shown in table
$3.59M (2026 real AUD)

Reported / source value
$3.50M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$18.65M

Shown in table
$18.65M (2026 real AUD)

Reported / source value
$18.20M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$53,279

Shown in table
$53.3k (2026 real AUD)

Reported / source value
$52.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Provides official benchmark O&M costs for black coal super-critical large units.

Reference
2025 Energy Technology Cost and Technical Parameter Report (high confidence)
Source recorded 05 Jun 2026

Variable OPEX / MWh
$8.20

Shown in table
$8.20 (2026 real AUD)

Reported / source value
$8.00 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Provides official benchmark variable O&M cost for black coal super-critical large units.

Reference
2025 Energy Technology Cost and Technical Parameter Report (high confidence)
Source recorded 05 Jun 2026

Fuel cost / GJ
$2.77

Shown in table
$2.77 (2026 real AUD)

Reported / source value
$2.70 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Provides a benchmark black coal fuel input cost assumption.

Reference
Board Presentation (medium confidence)
Source recorded 05 Jun 2026

Heat rate GJ/MWh
8.82

Shown in table
$8.82 (2026 real AUD)

How this was derived
Provides a black coal heat-rate assumption from AEMO-linked ISP materials.

Reference
Board Presentation (medium confidence)
Source recorded 05 Jun 2026

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
Callide B was commissioned in 1988 and is 100% owned by CS Energy. No plant-specific greenfield capex figure was found in official owner/government sources in the searched results, so capex remains unset rather than inferred from technology benchmarks. AEMO benchmark O&M for black coal super-critical large plant was used as the closest available official proxy for operating costs; however Callide B is sub-critical, so these O&M assumptions are approximate. System/market conditions and any post-commissioning refurbishments are not reflected in capex_total_aud.