Solar · Bundaberg Development Pty Ltd · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
19 Sep 2026 02:40 → 20 Sep 2026 02:40 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.| Effective from | MLF |
|---|---|
| 2026-02-24 | 0.9677 |
| 2026-07-01 | 0.9323 |
| Capex total (greenfield) |
$106.96M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$19.38M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$248,477
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$14.55
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex announcement could be verified from the owner/developer or government sources in the available search results. GPG Australia confirms Bundaberg was under construction in 2024 and identifies it as a 100 MW photovoltaic project; however, the sources located do not provide a total project cost. O&M and life assumptions were therefore proxied from AEMO/Aurecon 2024 large-scale solar PV benchmarks. The benchmark values found are for utility-scale solar PV and indicate single-axis tracking has higher capital cost and maintenance requirements than fixed-tilt systems. The fixed O&M figure retrieved appears to be an annual total for a hypothetical large-scale project rather than a per-MW figure, so it should be reviewed before use in valuation models.