Bundaberg Solar Farm (BUSF1)

Solar · Bundaberg Development Pty Ltd · Solar PV - Single axis tracking

Development AEMO: Committed QLD1 Solar - Solar NEM data · 24 hours
78 MW
Registered nameplate capacity
24 hours revenue
$-2.7k
Capacity factor
33.2%
Revenue / MWh
$-4.30
Est. SRMC
$14.55/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
78 MW

AEMO status Committed
Project status Development (AI)

Region QLD1
Coordinates

MLF 0.9323
DUID BUSF1
Owner Bundaberg Development Pty Ltd
Commissioned Dec 2025
Expected closure 2055
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
19 Sep 2026 08:45 → 20 Sep 2026 08:45 AEST

Dispatch & revenue

19 Sep 2026 08:45 → 20 Sep 2026 08:45 AEST

Energy revenue (× MLF)
$-2.7k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
622.3 MWh
Available
539.2 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9323
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of chargeINITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2026-02-24 0.9677
2026-07-01 0.9323

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
78 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$14.55/MWh
Capex total (greenfield)
$106.96M

Shown in table
$106.96M (2026 real AUD)

Reported / source value
$101.40M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$19.38M

Shown in table
$19.38M (2026 real AUD)

Reported / source value
$18.37M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$248,477

Shown in table
$248.5k (2026 real AUD)

Reported / source value
$235.6k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark fixed O&M value for the reference solar PV case used as fallback.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 05 Jun 2026

Variable OPEX / MWh
$14.55

Shown in table
$14.55 (2026 real AUD)

Reported / source value
$13.79 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark variable O&M value for the reference solar PV case used as fallback.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 05 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield capex announcement could be verified from the owner/developer or government sources in the available search results. GPG Australia confirms Bundaberg was under construction in 2024 and identifies it as a 100 MW photovoltaic project; however, the sources located do not provide a total project cost. O&M and life assumptions were therefore proxied from AEMO/Aurecon 2024 large-scale solar PV benchmarks. The benchmark values found are for utility-scale solar PV and indicate single-axis tracking has higher capital cost and maintenance requirements than fixed-tilt systems. The fixed O&M figure retrieved appears to be an annual total for a hypothetical large-scale project rather than a per-MW figure, so it should be reviewed before use in valuation models.