Bundaberg Solar Farm (BUSF1)

Solar · Bundaberg Development Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: Committed QLD1 Solar - Solar NEM data · 24 hours
78 MW
Registered nameplate capacity
24 hours revenue
$2.3k
Capacity factor
25.3%
Revenue / MWh
$4.90
Est. SRMC
$14.55/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
78 MW

AEMO status Committed
Project status Operational (AI)

Monford Group project page (2024) describes Bundaberg Solar Farm as delivered EPC works; AEMO records show commissioning completed 2025-12-01, implying the asset is now operational.

Region QLD1
Coordinates —

MLF 0.9323
DUID BUSF1
Owner Bundaberg Development Pty Ltd
Commissioned Dec 2025
Expected closure 2055
Closure date —
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM PVH
Module / inverter supplier solar modules and inverters
Inverter OEM Sungrow
Inverter model inverters (model not documented)
Equipment confidence low
Stats window
04 Nov 2026 02:10 → 05 Nov 2026 02:10 AEST

Dispatch & revenue

04 Nov 2026 02:10 → 05 Nov 2026 02:10 AEST

Energy revenue (× MLF)
$2.3k
FCAS revenue (× MLF)
$0
FCAS volume
— MWh
Dispatched
473.5 MWh
Available
— MWh
Curtailed
— MWh
Curtailment
—
of available
MLF used
0.9323
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional price — dispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of charge — INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2026-02-24 0.9677
2026-07-01 0.9323

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
78 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$14.55/MWh
Capex total (greenfield)
$106.96M

Shown in table
$106.96M (2026 real AUD)

Reported / source value
$101.40M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
—
Capex / MW derived
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$19.38M

Shown in table
$19.38M (2026 real AUD)

Reported / source value
$18.37M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$248,477

Shown in table
$248.5k (2026 real AUD)

Reported / source value
$235.6k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark fixed O&M value for the reference solar PV case used as fallback.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 05 Jun 2026

Variable OPEX / MWh
$14.55

Shown in table
$14.55 (2026 real AUD)

Reported / source value
$13.79 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark variable O&M value for the reference solar PV case used as fallback.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 05 Jun 2026

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No plant-specific greenfield capex announcement could be verified from the owner/developer or government sources in the available search results. GPG Australia confirms Bundaberg was under construction in 2024 and identifies it as a 100 MW photovoltaic project; however, the sources located do not provide a total project cost. O&M and life assumptions were therefore proxied from AEMO/Aurecon 2024 large-scale solar PV benchmarks. The benchmark values found are for utility-scale solar PV and indicate single-axis tracking has higher capital cost and maintenance requirements than fixed-tilt systems. The fixed O&M figure retrieved appears to be an annual total for a hypothetical large-scale project rather than a per-MW figure, so it should be reviewed before use in valuation models.

Sources