Bulgana Green Power Hub - Wind Farm (BULGANA1)

Wind · Bulgana Wind Farm Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service VIC1 Wind - Wind NEM data · 24 hours
204 MW
Registered nameplate capacity
24 hours revenue
$-6.5k
Capacity factor
34.8%
Revenue / MWh
$-3.78
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
204 MW

AEMO status In Service
Project status Operational (AI)

Premier of Victoria, 2021: Neoen commenced full-scale commercial operations of the Bulgana Green Power Hub.

Region VIC1
Coordinates -37.03944, 142.98278 (AI)

Wikipedia/Wikidata excerpt: coordinates 37°02′22″S 142°58′58″E for Bulgana Green Power Hub.

MLF 0.8907
DUID BULGANA1
Owner Bulgana Wind Farm Pty Ltd
Commissioned Nov 2021
Expected closure 2049
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Siemens Gamesa
Turbine model SG 3.4-132
Equipment confidence high
Stats window
12 Jun 2026 13:15 → 13 Jun 2026 13:15 AEST

Dispatch & revenue

12 Jun 2026 13:15 → 13 Jun 2026 13:15 AEST

Energy revenue (× MLF)
$-6.5k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
1,707.6 MWh
Available
1,467.0 MWh
Curtailed
9.5 MWh
Curtailment
0.6%
of available
MLF used
0.8907
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8733
2025-07-01 0.8907

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
204 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$702.74M

Shown in table
$702.74M (2026 real AUD)

Reported / source value
$565.00M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Neoen’s later operational announcement references an A$350 million investment, which likely reflects the original wind-plus-storage project financial close/construction investment announcement.

Reference
Neoen’s Bulgana Green Power Hub begins full-scale commercial operation in Victoria, Australia (medium confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MW derived
$3,438,045

Shown in table
$3.44M (2026 real AUD)

Reported / source value
$2.76M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026

Notes
Plant-specific greenfield project cost was found in official Victorian Government and Neoen sources. The hub is a hybrid project (204 MW wind farm + 20 MW / 34 MWh battery), but the reported total investment appears to cover the full hub, not wind-only. Fixed O&M not found in source-backed project-specific material; not estimated here because no clear plant-specific O&M benchmark was retrieved in the searched sources.