Solar · PARF Company 6 Pty Limited · Solar PV - Fixed
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
14 May 2026 19:55 → 13 Jun 2026 19:55 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.7784 |
| 2025-07-01 | 0.8642 |
| Capex total (greenfield) |
$209.50M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,952,777
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$1.33M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$25,140
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.28
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Plant-specific greenfield construction cost was reported by AGL as approximately $150 million for the 53 MW Broken Hill Solar Plant. Broader project announcements also stated the combined Nyngan + Broken Hill project cost was approximately $440 million, so a combined-project figure should not be used as this site's standalone capex. Ownership/operations have since changed to PARF/Tilt-related arrangements, but the capex value is for original greenfield construction.