Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 14:35 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.8518 |
| 2025-07-01 | 0.9228 |
| Capex total (greenfield) |
$105.49M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,109,705
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$2.11M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$42,194
Shown in table Reported / source value |
| Variable OPEX / MWh |
$2.11
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
11.75
Shown in table How this was derived Reference |
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
Despite searching Transgrid and related sources, no plant-specific greenfield construction cost for Broken Hill GT / GB01 was found. Available Transgrid material indicates the Broken Hill backup supply historically used two 25 MW diesel-fired turbines and that Transgrid acquired them from Essential Energy in 2022, but this does not provide original construction capex for GB01. Therefore capex uses the server-side default fallback only. Heat-rate fallback uses AEMO's generic new OCGT incremental heat rate as a proxy for this diesel OCGT asset; diesel-specific fuel use, emissions intensity, and asset life were not verified from source documents.