Braemar 2 Power Station (BRAEMAR6)

Coal · NewGen Braemar 2 Partnership comprising Arrow Braemar 2 Pty Ltd and Arrow Southern Generation Pty Ltd · Turbine - OCGT

Operational AEMO: In Service QLD1 Fossil - Coal Seam Methane NEM data · 24 hours
173 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$133.36/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
173 MW

AEMO status In Service
Project status Operational (AI)

Power Technology (2024) notes Braemar Power Station II was commissioned in August 2009 and is currently active; Arrow Energy says Braemar 2 is in service.

Region QLD1
Coordinates -27.10987, 150.90765 (AI)

Climate Change in Australia AEMO generators CSV lists BRAEMAR 2 POWER STATION at -27.1098727, 150.9076533.

MLF 0.9667
DUID BRAEMAR6
Owner NewGen Braemar 2 Partnership comprising Arrow Braemar 2 Pty Ltd and Arrow Southern Generation Pty Ltd
Commissioned
Expected closure 2049
Closure date
Technology Turbine - OCGT
Fuel Fossil - Coal Seam Methane
Equipment OEM Siemens
Equipment type / model SGT5-2000E
Secondary OEM Siemens
Secondary equipment SGen5-100A
Equipment confidence high
Stats window
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

Dispatch & revenue

12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
3,768.0 MWh
Curtailed
3,768.0 MWh
Curtailment
100.0%
of available
MLF used
0.9667
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9627
2025-07-01 0.9667

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
173 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$133.36/MWh
Capex total (greenfield)
$833.33M

Shown in table
$833.33M (2026 real AUD)

Reported / source value
$530.00M (2009 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Contemporaneous report of Braemar 2 greenfield construction cost, including the associated gas pipeline.

Reference
Braemar 2 power station achieves operational status (medium confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MW derived
$4,816,956

Shown in table
$4.82M (2026 real AUD)

Reported / source value
$3.06M (2009 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated from reported total project cost and the DUID capacity supplied by the user.

Reference
Braemar 2 power station achieves operational status (medium confidence)
Source recorded 05 Jun 2026

Fixed OPEX (annual)
$9.61M

Shown in table
$9.61M (2026 real AUD)

Reported / source value
$6.12M (2009 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated from per-MW O&M assumption and the provided 173 MW capacity.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 05 Jun 2026

Fixed OPEX / MW-yr
$55,541

Shown in table
$55.5k (2026 real AUD)

Reported / source value
$35.3k (2009 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/Aurecon 2024 report provides OCGT benchmark O&M inputs; the per-MW figure used here is a derived normalization from the benchmark set because the retrieved lines did not show the OCGT row directly.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 05 Jun 2026

Variable OPEX / MWh
$7.36

Shown in table
$7.36 (2026 real AUD)

Reported / source value
$4.68 (2009 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark variable O&M from the 2024 AEMO/Aurecon review.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 05 Jun 2026

Fuel cost / GJ default
$12.00

Shown in table
$12.00 (2026 real AUD)

Heat rate GJ/MWh default
10.50

Shown in table
$10.50 (2026 real AUD)

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026

Notes
Greenfield construction cost sourced from a contemporaneous operational-status report stating the Braemar 2 power station and associated high-pressure gas pipeline were completed at about A$530m. The site is a 450MW OCGT facility in the source, while the provided DUID capacity is 173MW; capex per MW is therefore calculated using the user-provided 173MW capacity. Fixed O&M and variable O&M use AEMO/Aurecon 2024 benchmark values for OCGT; fixed O&M was prorated from a larger benchmark plant to a per-MW basis because the source table did not provide a direct OCGT per-MW figure in the retrieved lines. No reliable plant-specific heat rate, fuel cost, or emissions intensity was located in the searched sources.

Sources