Coal · Braemar Power Project Pty Ltd · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
14 Jun 2026 00:00 → 14 Jun 2026 05:35 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9627 |
| 2025-07-01 | 0.9667 |
| Capex total (greenfield) |
$246.29M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,310,044
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$45,000
Shown in table How this was derived Reference |
| Variable OPEX / MWh default |
$2.50
Shown in table How this was derived Reference |
| Fuel cost / GJ default |
$12.00
Shown in table |
| Heat rate GJ/MWh default |
10.50
Shown in table |
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex announcement or owner/developer total project cost was found in the searched official/primary sources. Public sources confirm Braemar Power Project Pty Ltd operates Braemar units 2 and 3 as OCGT and that Braemar Power Station is the relevant asset, but the capital cost remains undisclosed in the available sources. Because no verified plant-specific capex was found, no benchmark fallback has been applied here pending further review per instructions. The plant is an older operating asset and published operating assumptions are sparse in primary sources.