Coal · Braemar Power Project Pty Ltd · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
14 Jun 2026 00:00 → 14 Jun 2026 01:35 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9627 |
| 2025-07-01 | 0.9667 |
| Capex total (greenfield) |
$582.19M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,096,765
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$20.19M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$107,369
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$7.75
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ default |
$12.00
Shown in table |
| Heat rate GJ/MWh default |
10.50
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Greenfield capex uses a reported project cost for the 450 MW Braemar power station commissioned in August 2006; this is likely the original Braemar plant rather than the BRAEMAR1 DUID share, which is registered at 188 MW in the prompt. AEMO 2024 cost review was used only for O&M fallback; no plant-specific refurbishment cost found. The available sources retrieved did not provide a reliable plant-specific heat rate or fuel cost for this unit.