Solar · South Australian Water Corporation · Solar PV - Fixed
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
14 May 2026 23:25 → 13 Jun 2026 23:25 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 1.0004 |
| 2025-07-01 | 0.9999 |
| Capex total (greenfield) |
$10.60M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,285,047
Shown in table Reported / source value How this was derived |
| Fixed OPEX (annual) |
$173.5k
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$21,028
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.23
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: estimated · AI checked 04 Jun 2026
Notes
Plant-specific greenfield CAPEX and O&M/fuel/performance parameters were not found in the web results provided; therefore technology defaults were applied. No major refurbishment/brownfield upgrade costs were found, so refurbishment fields remain null.