Wind · South Pacific Power Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
15 May 2026 05:55 → 14 Jun 2026 05:55 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9344 |
| 2025-07-01 | 0.9557 |
| Capex total (greenfield) |
$502.87M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,450,209
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$1.02M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$70,690
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Boco Rock Wind Farm was announced in 2013 as a $350 million project and entered operation in late 2014. The reported capex appears to refer to the 113 MW stage-one wind farm, not the 14.4 MW DUID slice; therefore capex per MW is based on 113 MW, while the DUID capacity remains a local asset identifier. No verified refurbishment cost found.